Case Study

Case Study Hospitality Chonburi

A 5-star beachfront resort with 555 rooms, operating 24/7 just 230 metres from the coast. The project was delivered under a 20-year Retrofit–Operate–Transfer (ROT) model with guaranteed performance.

million kWh saved
> 0
energy saving achieved
0 %

Challenge

The coastal location demanded durable materials and construction methods to withstand salt exposure and humidity. The retrofit had to be executed without disrupting guest comfort or daily operations in a fully occupied resort.

Solution

Two new high-efficiency water-cooled chillers were installed under the ROT model. System transfer and installation were executed seamlessly, maintaining continuous cooling while improving overall energy performance.

Outcome

The project achieved 25% energy savings, cutting consumption by over 1 million kWh annually and avoiding 490 tonnes of CO₂ emissions. The upgraded system continues to deliver stable cooling, long-term reliability, and sustained operational efficiency.